Managing the Transition from Project Delivery
to Operations
ADVISORY ARTICLE
By Daniel Cáceres, PMP
Electronic Engineer: Telecommunications & Digital Infrastructure
Lima, Peru
Introduction — A Project Can End Before Its Consequences Do
A project can meet its delivery objectives, complete commissioning, obtain formal acceptance, and close successfully while the organization receiving the asset is still not fully prepared to operate it.
This distinction became increasingly clear to me through years of working across different stages of telecommunications and infrastructure projects. Project teams focus on delivering scope, resolving observations, completing tests, meeting contractual requirements, and reaching acceptance. Operations and Maintenance (O&M), however, must sustain the asset after the project organization begins to withdraw.
The difference may not be visible on the day of handover. It often appears when the asset experiences its first significant operational event.
At that moment, questions that seemed secondary during delivery can become critical. Does the as-built documentation represent what was actually installed? Who provides technical support when a specialized system fails? Are there unresolved conditions or residual risks that Operations is expected to manage?
These questions do not necessarily indicate project failure. Equipment fails, assets deteriorate, operating conditions change, and external events can affect even well-designed and properly delivered infrastructure.
The issue is whether formal transfer of the asset was accompanied by sufficient transfer of the knowledge, support visibility, risk awareness, and operational capability surrounding it.
Association for Project Management research similarly treats handover as a process rather than a single date, emphasizing progressive transfer of knowledge and operational responsibility.
For the project manager, the broader question is therefore not only whether the asset was delivered.
It is also:
Was the receiving organization prepared to assume it?
The first operational failure should not become the first real audit of the project handover.
- The Project-to-Operations Gap
Projects and operations work under different time horizons.
A project organization is temporary. Once its objectives have been achieved, its people, contractors, specialists, and resources progressively move elsewhere. Operations remains with the asset and must sustain it throughout its operational life.
This creates a potential gap when one organization begins to withdraw and the other assumes responsibility.
The gap is not necessarily caused by missing equipment or incomplete work. An asset may be installed, tested, commissioned, and operating correctly while the receiving organization still lacks sufficient visibility into what was delivered and what will be required to sustain it.
More…
To read entire article, click here
How to cite this work: Cáceres, D. (2026). When the Project Ends but the Risk Remains: Managing the Transition from Project Delivery to Operations, advisory, PM World Journal, Vol. XV, Issue XI, November. Available online at https://pmworldjournal.com/wp-content/uploads/2026/11/pmwj170-Nov2026-Caceres-When-Project-Ends-but-Risk-Remains.pdf
About the Author

Daniel Cáceres
Lima, Peru
![]()
Daniel Cáceres, PMP is an Electronic Engineer and senior project management professional with more than 26 years of professional experience across telecommunications, technology projects, and digital infrastructure in Peru. His experience includes project implementation, commissioning, operations and maintenance, risk management, and infrastructure lifecycle management. He also develops and shares professional content through his newsletter, Infraestructura & Estrategia, and other professional platforms, contributing field-based insights and lessons learned for professionals and readers interested in project delivery, infrastructure implementation, and operations. He is based in Lima, Peru.