Programming is the actual taking of utilization information and other user input and translating that into a needed number or spaces along with their net sizes. The next section provides a brief history of programming as a skill and discusses its evolution into more software-based methodologies to perform this function.
Prior to the advent of computers in every aspect of our lives, things were done with the human mind. A slower process at best but efficient, nonetheless. The same can be said for the programming process in that demand projections were done “long hand” and that data estimates, when approved, were part of the basis for the programming effort. From utilization data the calculation of numbers of rooms to meet demand was estimated (based upon anecdotal capacities, turnaround time, staffing, etc.) and net square footage listing were prepared department by department. Net square footage is defined as the number of spaces multiplied by the actual net area of the room (another words it excludes circulation).
Now healthcare consultants have computer software for calculating room need based on throughput, operating hours, number of practitioners, and estimated patient volumes. These models allow many changes in assumption which in turn allows for many utilization scenarios quickly. Obviously, the models are only as good as the assumptions used and therein lies some potential issues in that management consensus on assumptions used is of great importance relative to capital expenditures and overall cash flow.
The calculation of the number of exam room required for an outpatient facility is a good example of model use. Anecdotal data coupled with varying utilization projections can assist in exam room need. It can also be used to identify those exam modules that may not be fully utilized, which allows the opportunity to flex those rooms for other services on a scheduled basis. Flexing exam and treatment rooms among specialties (assuming rooms are amenable for multiple sub-specialty use) helps to maximize utilization and address peak day utilization by the usage of adjacent exam modules.
However, projections and results should be discussed with administration and users (as appropriate) in that on occasion the inputs need to be calibrated to allow for local hospital utilization experience. It has been my experience that some departmental users are a little robust in their projections which is the reason that at many hospitals where I have worked administration states that all projections must be developed and approved at their level to ensure cohesion with business models and associated projections.
So, the actual calculation of room types is a function of either utilization, staffing pattern, mandated spaces by regulatory authorities or infrastructure need. Offices and cubicles are certainly easy to calculate as are MD offices. In academia however, some departments want researchers and some nurse practitioners proximate to the MDs that they relate to. When I worked at Wake Forest Baptist Hospital and did all the space programs for the academic areas I was queried severely by the Dean of the medical center as to why nurses and extraneous staff (other than selected administrative staff) were provided space in the academic setting. Being the messenger, I was not in a position to advocate the allocation of space for the medical clinical/research staff who he said should have space assigned in the clinical setting which led to other issues. In addition, the Dean waited one year to review my space programs for all academic areas and when he reviewed it was not updated to accommodate new hires leading to more acrimony when I presented the space allocations to the various chairmen.
More…
To read entire article, click here
How to cite this article: Jackson, W. (2026). Health Care Planning, Design and Delivery Series Guide 2: Programming and Design Process, PM World Journal, Vol. XV, Issue X, October. Available online at https://pmworldjournal.com/wp-content/uploads/2026/10/pmwj169-Oct2026-Jackson-Guide-2-Programming-and-Design.pdf
About the Author

William C. Jackson
USA & Colombia
![]()
William C Jackson, MS, MA Fellow HFI. has been involved with healthcare facilities planning, programming, design oversight and project delivery for over 40 years. He has consulted or worked directly for 60 hospitals in national and international settings. He has been associated with 9.0 million square feet of hospital projects put in place; He has worked for design firms (Ellerbe, HDR and Heery), consulting firms, PM firms and academic medical centers (17 years) including Bowman Gray School of Medical at Wake Forest and the Miller School of Medicine at the University of Miami. International work includes seven years of varying roles in the United Arab Emirates working on two 3,0 million square foot hospitals, Turkey, Haiti and Nassau. He is presently semi-retired, living in Medellin, Colombia, and can be reached at bjcamel2012@gmail.com.