Cost and Schedule Performance of Building Construction Logistics

 

A study of the current state of Building construction

practices on project delivery in South East Nigeria

 

FEATURED PAPER

By Justin  Obinna Ibeawuchi, PhD , 

Prof Nnatuanya Ugochukwu Okonkwo

and

Stanley Chigozie Duruibe, PhD

Imo State, Nigeria


ABSTRACT

Contractors, suppliers, and trucking firms may find it difficult to communicate effectively with one another due to the logistical complexity of many projects. As a result, deliveries are delayed, deadlines are missed, and the overall profitability of the project may be jeopardized. This will eventually affect how logistics and deliveries are managed towards achieving project success. Therefore, the study explored the use of earned value analysis technique to measure cost and schedule performance indexes of   building construction logistics for successful project delivery at any given milestone. The study design includes field survey and multiple case study approaches. Data were obtained through the  collection of cost and schedule performance of logistics data base of the case study construction companies  at two different milestone of after six months(01-03-2022 to 01-09-2022.) and after twelve months(02-09-2022 to 02-03-2023). Earned Value Analysis, factor analysis and multiple regression were tailored towards the analysis of the major issues in the study and executed with the aid of statistical tool in SPSS version 25.0. The logistics data result were computed using Cost Performance Index (CPI) and Scheduled Performance Index (SPI).Hence, the study concludes that the  result was too poor thus signaling the need to developing an improved  building construction  logistics framework(BCLF). The study recommends the adoption of the BCLM, which is a simplified model aimed at improving time overruns, material coordination and logistical inefficiencies.

Keywords: Construction Logistics, Factor analysis, multiple regression, Schedule performance index, Cost performance index, Milestone, South East.

INTRODUCTION

In recent years, more focus has been placed on the logistics activities in construction projects in order to reduce total costs. Despite its significance, the construction industry continues to experience persistent challenges relating to project delays, cost overruns, inefficient resource utilization, poor coordination among stakeholders, and ineffective logistics management. Studies indicate that a significant proportion of construction projects exceed their planned budgets and schedules due to inadequate planning, poor monitoring systems, material shortages, inefficient procurement processes, and ineffective logistics coordination (Chen & Zhang, 2012; Aramali et al. 2022)

Building construction projects are characterized by high levels of complexity because they involve multiple interdependent activities that require effective coordination of labor, materials, equipment, subcontractors, and information throughout the project lifecycle. Construction logistics forms the backbone of these activities by ensuring that construction resources are delivered to the right location, at the appropriate time, in the required quantity and quality, while minimizing waste and unnecessary costs. Efficient logistics management significantly influences project productivity, safety performance, sustainability, and overall project success. Conversely, ineffective logistics planning often results in material shortages, excessive inventory, transportation delays, equipment idle time, site congestion, increased operational costs, and project schedule disruptions. Recent reviews emphasize that logistics remains an underdeveloped but highly influential component of construction management and sustainability (Haag and Junger, 2023)

Construction logistics encompasses the planning, implementation, coordination, and control of the movement and storage of construction materials, equipment, workforce, and information from suppliers to construction sites. Unlike manufacturing industries where production occurs in fixed locations, construction projects operate in dynamic and constantly changing environments. Every construction site presents unique logistical challenges arising from varying geographical conditions, limited storage spaces, changing work sequences, weather conditions, traffic restrictions, and stakeholders’ requirements. These characteristics require project managers to adopt sophisticated planning and monitoring techniques capable of integrating project cost, schedule, scope, and logistics performance simultaneously. (Haag and Junger, 2023)

More…

To read entire paper, click here

How to cite this paper: Ibeawuchi, J. O., Okonkwo, N. U., Duruibe, S. C. (2026). Cost and Schedule Performance of Building Construction Logistics: A study of the current state of Building construction practices on project delivery in South East Nigeria; PM World Journal, Vol. XV, Issue XI, November. Available online at https://pmworldjournal.com/wp-content/uploads/2026/11/pmwj170-Nov2026-Ibeawuchi-et-al-Performance-of-Building-Construction-Logistics.pdf


About the Authors


Justin Obinna Ibeawuchi, PhD

Owerri, Nigeria

 

Engr (Dr) Justin Obinna Ibeawuchi is a lecturer at the Department of Project Management Technology of Federal University of Technology Owerri. He studied Civil Engineering (B.Eng.) from Federal University of Technology Owerri and MSc in Engineering Management from University of Greenwich United Kingdom and holds a PhD in Project Management Technology from Federal University of Technology Owerri. He is a registered Engineer by Council for Regulation of Engineering in Nigeria (COREN) and member Nigeria Society of Engineers. He has over fifteen years of experience in building construction, and Oil &Gas project. My research interest is centered on construction logistics, Lean systems, Process improvement and Project performance measurement. He can be reached at: justin.ibeawuchi@futo.edu.ng;   justinibeawuchi01@gmail.com   .

 


Ugochukwu Nnatuanya Okonkwo, PhD

Umudike, Abia State, Nigeria

 

Prof. Ugochukwu Nnatuanya Okonkwo received B.Eng (Civil) from Federal University of Technology Owerri, M.Eng (Geotechnical Engineering) from Bayero University Kano and Ph.D (Geotechnical Engineering) from University of Nigeria Nsukka. He is a Professor in the Department of Civil Engineering of Michael Okpara University of Agriculture Umudike as well as a consultant to Civil and Construction Engineering firms. He is also a registered Engineer by Council for Regulation of Engineering in Nigeria (COREN). Prof. Okonkwo has been teaching courses related to Civil Engineering Materials, Soil Mechanics and Structural Foundation Engineering up to Postgraduate level for about nineteen years. His area of research interest includes geo-environmental, highway engineering, modeling, optimization, erosion control, slope stability and geotechnical engineering. He has to his credit many publications and also a Reviewer as well as a member of Editorial Board in some reputable journals. He can be reached at: okonkwo.ugochukwu@mouau.edu.ng

 


Dr. Stanley Chigozie Duruibe

Owerri, Nigeria

 

Dr. Stanley Chigozie Duruibe is a Lecturer in the Department of Entrepreneurship and Innovation at the Federal University of Technology, Owerri. Nigeria. He holds a Bachelor’s degree in Economics, as well as Master’s and Doctoral degrees in Financial Management Technology. Dr. Duruibe is a member of several professional bodies, including the International Academy of Business and Economics (IABE), Stockton, USA, and the Nigerian Institute of Management (NIM), Chartered. He has also obtained 18 professional certifications in Business and Management from the Strathmore Business School and the Gordon Institute of Business Science. He can be reached: Stanley.duruibe@futo.edu.ng.