in Transmission Planning Research
PEER REVIEWED PAPER
By Yarina Bohdanivna Lozynska
Head of the Department of Innovations in Energy Construction
Scientific Center for Energy Systems Engineering “PromEnergo Analytics”
Lviv, Ukraine
Abstract
Infrastructure delivery across industrialized economies displays substantial dispersion in cost and schedule performance. While recent empirical inquiries attribute this divergence predominantly to strategic planning depth, the prevailing causal specification conflates managerial competence with an unmeasured selection mechanism governed by regulatory jurisdiction. Project developers possessing advanced forecasting capabilities and formal risk protocols systematically concentrate within institutionally coherent jurisdictions characterized by consolidated permitting. Disentangling these dynamics requires evaluating the joint distribution of planning rigor and administrative regime, two dimensions reported exclusively as separate marginals in current empirical benchmarks. Synthesizing project evaluations against the broader literature on siting disputes and infrastructure governance reveals that the empirical support divides sharply by operational domain. Active risk monitoring constitutes an internal capability that reliably accelerates schedule recovery across diverse regulatory environments. Conversely, reported variations in right-of-way acquisition and statutory approval durations mirror institutional selection artifacts rather than organizational discipline. Using secondary evidence from comparative project datasets spanning 2011 to 2025, this study formalizes the methodological criteria and cross-tabulation structures necessary to test whether documented performance premiums stem from internal execution or external institutional access.
Key words: transmission infrastructure, strategic planning, regulatory fragmentation, cost overrun, selection bias, project governance
Introduction
Comprehensively planned transmission and substation projects complete within 5 to 12 percent of budget and 5 to 15 percent of schedule. By contrast, conventionally planned assets in the same baseline sample experience cost overruns of 30 to 45 percent and schedule slippages reaching 35 to 50 percent, with right-of-way acquisition, regulatory approval, and engineering design modifications driving more than half of total project delay (Bondar, 2026b). This stark divergence has elevated planning comprehensiveness above contractor selection and technology choice as the primary explanatory variable in grid delivery research. Nevertheless, the physical and legal clearances generating the largest share of schedule variance depend on land-tenure frameworks and statutory permitting authorities operating outside the project boundary.
Prevailing transmission models interpret this performance differential as an endogenous achievement of project governance, crediting extended forecasting horizons, proactive stakeholder consultations, and systematic risk monitoring. In doing so, these studies hold the surrounding regulatory environment constant precisely where administrative institutions exert their strongest influence. Expert risk-weighting evaluations demonstrate that environmental risk categories, encompassing statutory policy, social opposition, and ecological permitting, command more than double the combined weight of internal technical and managerial risks (Xiao et al., 2022). Treating the external institutional baseline as a fixed parameter fundamentally alters what the estimated planning coefficient captures in empirical estimations.
Comparative infrastructure research outside the electrical transmission sector confirms that on-budget capital delivery is achievable at programmatic scale. Rail and highway networks delivered across Denmark, Norway, and Sweden between 2008 and 2022 consistently met cost targets, departing from the systemic cost escalations documented in standard project management corpora (Chapman, 2025). This institutional consistency rarely reflects organizational execution alone. Evaluations of Swedish transport programs reveal that capital escalation concentrates during pre-decision appraisal, when statutory land designations and inter-agency reviews remain unresolved (Chapman, 2024; Eliasson, 2025). Where project performance clusters systematically by national institutional regime and project lifecycle phase, jurisdictional sorting provides a more robust causal explanation than managerial capability alone.
More…
To read entire paper, click here
How to cite this paper: Lozynska, Y. B. (2025). The Jurisdiction Confound in Transmission Planning Research; PM World Journal, Vol. XV, Issue XI, November. Available online at https://pmworldjournal.com/wp-content/uploads/2026/11/pmwj170-Nov2026-Lozynska-Jurisdiction-Confound-in-Transmission-Planning-Research.pdf
About the Author

Yarina Bohdanivna Lozynska
Lviv, Ukraine
![]()
Yarina Bohdanivna Lozynska is Head of the Department of Innovations in Energy Construction at the Scientific Center for Energy Systems Engineering, PromEnergo Analytics, based in Lviv, Ukraine. She specializes in energy construction and the innovative development of energy infrastructure, with more than 20 years of professional experience. Her work covers the development and implementation of innovative solutions in energy construction, the modernization of energy facilities, improving energy efficiency and the economic performance of infrastructure projects, and the organization and management of technological development projects.