Do 80% of organizations average

 

a project failure rate of 80%?

 

COMMENTARY

By Patrick Weaver

Melbourne, Australia


This short article is not intended to provide precise numbers, rather to highlight an intriguing anomaly that could benefit from some structured research. But, if as one view of the data suggests, some 80% of organizations have project fail rates in the region of 80%, there is a significant project governance challenge to overcome.

Crunching the numbers

Over many years, and many different reports (each based on a different survey method) we regularly see the following data presented:

  1. Far more projects fail than succeed, the ratio is typically around 30% success 70% fail.
  2. There are some organizations that routinely achieve project success, these are slowly increasing as an overall percentage and currently sit at around 20%. These organizations deliver most of their projects successfully.
  3. But, the vast majority of executives surveyed think their organization manages its projects successfully. The percentage of executive with this view seems to sit comfortably above 80%.

But, unless there is a major distortion in one or more of the data sets, these findings are mutually incompatible!

If 20% of organizations that ‘do projects’ get most of their projects delivered successfully, it means this group has to account for at least half of the 30% of project successes, which pushes the ratio of fails for the rest of the organizations to a ratio of 15:65 = 19% success -vs- 81% fails.

In round numbers 80% of the organizations doing projects, appear to have an average project failure rate of around 80%.

But if more than 80% of executives feel their organizations deliver projects successfully the data suggests that a lot of these executives are seriously misinformed.

Using the same findings, if 20% of organisations deliver projects successfully, it is reasonable to assume 20% of the surveyed executives work for these organisations. Which means 60% of the executives that think their organisation do projects well, work for the 80% of organisations that fail to deliver projects successfully (together with the 20% of executives who know their organizations have problems).  So, in the 80% of organisations with project delivery issues, this gives a ratio for the executives of 60 misinformed to 20 who understand the situation. Rounding to 100% this is a ratio of 75% to 25%.

So, my question is why do some 75% of executives in the 80% of organizations that routinely fail to deliver projects successfully appear to believe the opposite? 

More…

To read entire paper, click here

How to cite this article: Weaver, P. (2023).  Do 80% of organizations average a project failure rate of 80%? commentary, PM World Journal, Vol. XII, Issue V, May. Available online at https://pmworldlibrary.net/wp-content/uploads/2023/05/pmwj129-May2023-Weaver-are-80-project-failure-rates-accurate.pdf


About the Author


Patrick Weaver

Melbourne, Australia

 

 Patrick Weaver, PMP, PMI-SP, FAICD, FCIOB, is the Managing Director of Mosaic Project Services Pty Ltd, an Australian project management consultancy specializing in project control systems.  He is a Fellow of the Chartered Institute of Building, Australasia (FCIOB) and a Fellow of the Australian Institute of Company Directors (FAICD). He is a member of the PMI Melbourne Chapter (Australia), as well a full member of AIPM, and the Project Management College of Scheduling (PMCOS).

Patrick has over 50 years’ experience in Project Management. His career was initially focused on the planning and managing of construction, engineering and infrastructure projects in the UK and Australia. The last 35 years has seen his businesses and experience expand to include the successful delivery of project scheduling services and PMOs in a range of government, ICT and business environments; with a strong focus on project management training.

His consultancy work encompasses: developing and advising on project schedules, developing and presenting PM training courses, managing the development of internal project control systems for client organizations, and assisting with dispute resolution and claims management.

In the last few years, Patrick has sought to ‘give back’ to the industry he has participated in since leaving college through contributions to the development of the project management profession. In addition to his committee roles, he has presented papers at a wide range of project management conferences in the USA, Europe, Asia and Australia, has an on-going role with the PGCS conference in Australia and is part of the Australian delegation to ISO TC258.

Patrick can be contacted at patw@mosaicprojects.com.au or at www.mosaicprojects.com.au.

To view other works by Pat Weaver, visit his author showcase in the PM World Library.net at https://pmworldlibrary.net/authors/patrick-weaver/ or visit his website.