Responding to Pat Weaver’s LETTER TO THE EDITOR
dated 15 September 2022
LETTER TO THE EDITOR
By Dr. Paul D. Giammalvo
Jakarta, Indonesia
21 October 2022
Ref: Weaver, P. (2022). On the History of Earned Value Management, Letter to the Editor, PM World Journal, Vol. XI, Issue X, October. Available online at https://pmworldlibrary.net/wp-content/uploads/2022/10/pmwj122-Oct2022-Weaver-on-the-history-of-EVM-Letter-to-Editor.pdf
Dear Editor,
Notwithstanding Pat’s condescending and “ad hominin” personal attacks, let me set the record straight.
I am NOT “just” or “only” an academic. For 55+ years, I have been a PRACTITIONER who spent 30 years as a Union carpenter and General Contractor, who happens to have earned my MS from GWU and a Ph.D. in Project and Program Management through the Institute Superieur De Gestion Industrielle (ISGI) and Ecole Superieure De Commerce De Lille (ESC-Lille), both while working full time and going to school part-time, under the supervision of Professor Christophe Bredillet, with such luminaries as J. Rodney Turner, Ralf Mueller, and Lynn Crawford as my dissertation review committee. This was no “degree mill.” I have also long been mentored by “big names” such as R. Max Wideman and the late Russ Archibald, who earned his honorary Ph.D. from ESC-Lille on the same day I did.
For 55+ years as a serial entrepreneur, I have “initiated, planned, executed, controlled and closed” many hundreds if not thousands of projects where my own money was on the line both as a Union CONTRACTOR (profit centers) and as a PROPERTY OWNER/DEVELOPER (cost or investment centers) using projects as an “asset delivery system” to “create, acquire, update, expand, repair, maintain and eventually dispose of” my PERSONAL and ORGANIZATIONAL ASSETS.
Having established my bona fides as both an academic and as a practitioner, here is my response to Pat’s letter.
CONSENSUS is NOT CONSISTENT with the “Scientific Method”
In the world of science, there is no such thing as CONSENSUS. (For a long time “consensus” was that the world was FLAT and, more recently, that mRNA vaccines were “safe” and could stop Covid 19, and we know what that “consensus” has done to us!!)
Italian scientist Giordano Bruno was burned at the stake for teaching, among other heretical ideas, Copernicus’ heliocentric view of the Universe. https://www.famous-trials.com/bruno/261-home
Likewise, Galileo was “declared guilty of “vehement suspicion of heresy” by the Catholic Church for his teachings as well. https://plato.stanford.edu/entries/galileo/#GaliChur
The scientific method requires that theories or hypotheses meet 5 tests or criteria: https://sciencing.com/five-characteristics-scientific-method-10010518.html
More…
To read entire Letter to the Editor, click here
How to cite this work: Giammalvo, P. D. (2022). On the History of Earned Value Management; Responding to Pat Weaver’s LETTER TO THE EDITOR dated 15 September 2022, Letter to the Editor, PM World Journal, Vol. XI, Issue XI, November. Available online at https://pmworldlibrary.net/wp-content/uploads/2022/11/pmwj123-Nov2022-Giammalvo-in-response-to-pat-weaver-Letter-to-Editor.pdf