Ref: Smith, K. F. (2023). BACK TO THE BARANGAY – Applying Rapid Appraisal & Problem Analysis Diagramming for a Project Pre-Feasibility Assessment: A Case Example, PM World Journal, Vol. XI, Issue V, May. Available online at https://pmworldlibrary.net/wp-content/uploads/2023/05/pmwj129-May2023-Smith-Back-to-the-Barangay-case-study-2.pdf
Dear David
A propos of my May 2023 article: BACK TO THE BARANGAY – I’m delighted to report that my project proposal — as outlined in the Problem Analysis Diagrams (PAD) below — was accepted in toto; the initial LIGHTING component was funded and just completed, with solar lighting, and backup cable connection!