SPONSORS

SPONSORS

Follow Up Report on Project ‘Ilaw’ (Light)

 

LETTER TO THE EDITOR

By Dr. Kenneth Smith

21 November 2023

Ref: Smith, K. F. (2023). BACK TO THE BARANGAY – Applying Rapid Appraisal & Problem Analysis Diagramming for a Project Pre-Feasibility Assessment: A Case Example, PM World Journal, Vol. XI, Issue V, May. Available online at https://pmworldlibrary.net/wp-content/uploads/2023/05/pmwj129-May2023-Smith-Back-to-the-Barangay-case-study-2.pdf


Dear David

A propos of my May 2023 article: BACK TO THE BARANGAY – I’m delighted to report that my project proposal — as outlined in the Problem Analysis Diagrams (PAD) below — was accepted in toto; the initial LIGHTING component was funded and just completed, with solar lighting, and backup cable connection!

More…

To read entire Letter to the Editor, click here

How to cite this work: Smith, K. F. (2023). Follow Up Report on Project ‘Ilaw’ (Light), Letter to the Editor, PM World Journal, Vol. XII, Issue XII, December. Available online at https://pmworldlibrary.net/wp-content/uploads/2023/12/pmwj136-Dec2023-Smith-report-on-project-light-Letter-to-Editor.pdf